Please Wait ...

C2 Coal Fired Power Plant (CFPP)

PT Cirebon Energi Prasana (CEPR), extension project C2 Coal Fired Power Plant (CFPP) 1 x 1000 MW Ultra Super Critical is hiring Talents (current stage construction and commissioning).

Urgently required

Operation

  • Plant Operation Shift Supervisor
  • Coal Operation Shift Leader
  • Coal Operation CR Supervisor

Maintenance

  • Boiler Engineer
  • Electrical Supervisor
  • Coal Leader
  • Coal Handling Facility Engineer

Project (Construction and Commissioning) – contract base

  • Electrical Engineer
  • Turbine Engineer
  • Document Control

Support

  • IT Application Specialist
  • Asset Management Specialist

General requirements:

  • Min. 7 years of experience in Coal Fired Power Plant (CFPP) with 5 years in related field for Leader positions.
  • Min. 6 years of experience in related field in CFPP for Engineer / Specialist positions.
  • Min. 3 years of experience in related field in CFPP for Supervisor positions.
  • Experience in large capacity CFPP (above 660 MW) with Super Critical Boiler will be an advantage.
  • Bachelor degree in Mechanical or Electrical Engineering and related field of study is more preferable.
  • Will be involved in pre-commissioning activities and pre COD planning and preparation, for Operation and Maintenance positions.
  • Willing to work in shift schedules for Operation positions.
  • Willing to work in Cirebon.

Send your Latest CV in English (max 1MB) with subject of related position eg. C2 Coal Operation Shift Leader not later than 1 December 2020 to recruitment@cirebonpower.co.id

Only application sent to mentioned email and shortlisted candidates will be processed.

Cirebon Power