{"id":744,"date":"2019-02-22T13:59:39","date_gmt":"2019-02-22T06:59:39","guid":{"rendered":"https:\/\/www.cirebonpower.co.id\/id\/?p=744"},"modified":"2019-09-13T14:01:32","modified_gmt":"2019-09-13T07:01:32","slug":"pembangunan-pltu-unit-2-cirebon-power-mencapai-39-persen","status":"publish","type":"post","link":"https:\/\/www.cirebonpower.co.id\/id\/pembangunan-pltu-unit-2-cirebon-power-mencapai-39-persen\/","title":{"rendered":"Pembangunan PLTU Unit 2 Cirebon Power Mencapai 39 Persen"},"content":{"rendered":"\n<p>RRI.co.id (22\/2\/2019) | Progres\nPembangunan Proyek Strategis Nasional yakni Pembangkit unit 2 Cirebon Power\nberkapasitas 1&#215;1000 MW saat ini sudah mencapai 39 persen dan ditargetkan\nberoperasi bulan Februari tahun 2022 mendatang.<\/p>\n\n\n\n<p>Kepada RRI Direktur Corporate Affairs\nCirebon Power, Teguh Haryono didampingi Petrus Sihono mengatakan proses\npembangunan sudah berjalan 39 persen dan ini diluar dugaan bisa mencapai target\ntersebut.<\/p>\n\n\n\n<p>&#8220;Pembangunan Unit 2 untuk Jawa,\nMadura dan Bali ini sudah berjalan on the track dan sudah mencapai 4,22 juta\njam kerja tanpa adanya kecelakaan kerja, ini meliputi temporary jetty, power\nblok fondation, some steel structure on progress, contracts and manufacturing\ndan husus untuk kontruksi itu sendiri progresnya 24,26 persen, ini sebuah\nprestasi maksimal, pembangunan unit 2 Cirebon Power ini juga sesuai dengan\nanggaran, tepat waktu, kualitas, dan yang paling penting adalah keselamatan dan\nkeamanan kerja, Selain itu juga kita target operasional dari semula bulan April\ntahun 2022 menjadi bulan Februari tahun 2022,&#8221; ujar Teguh Haryono kepada\nwartawan pada sesi Media Gathering di sebuah kafe Kota Cirebon pada Jumat\n(22\/2\/2019).<\/p>\n\n\n\n<p>Selain itu juga tandas Teguh total man\npower atau pekerja proyek sebanyak 1.590 orang. &#8221; Nah ini dengan banyaknya\npekerja yang mencapai 1590 orang ini memberikan peluang rejeki bagi masyarakat\ndi sekitar proyek ada yang membuka jasa pijit, kemudian warung kelontong\nberbagai kebutuhan makan dan minum, Rumah kontrakan atay kosan dan juga jasa\npenitipan sepeda motor,&#8221; ucap Teguh.<\/p>\n\n\n\n<p>Pihaknya berharap besar Pembangunan PLTU Unit 2 ini terus konsisten dan sesuai target agar kedepannya bisa memverikan manfaat yang lebih baik untuk pemenuhan kebutugan Listrik di Indonesia. Selain itu juga berbagai Penghargaan pun telah diterima oleh Cirebon Power dari PLTU Unit 1 sebesar 1 x 660 MW yakni The Green Era Sustainability Award 2019, ISO 9001, 14001, 45000, IBEA 2018 The Most Enviromentaly Conserned Companty, ISDA 2018 Platinum and Golden on Coastal Improvement Social Economic Empowerment, Residents, Life Quality Improvement, TOP CSR Aword 2018 untuk rumah terasi dan Top Leader On CSR Commitment.<br><br><br><strong>Sumber<\/strong><br>http:\/\/rri.co.id\/post\/berita\/640111\/teknologi\/pembangunan_pltu_unit_2_cirebon_power_mencapai_39_persen.html <\/p>\n","protected":false},"excerpt":{"rendered":"<p>RRI.co.id (22\/2\/2019) | Progres Pembangunan Proyek Strategis Nasional yakni Pembangkit unit 2 Cirebon Power berkapasitas 1&#215;1000 MW saat ini<span class=\"excerpt-hellip\"> \u2026<\/span><\/p>\n","protected":false},"author":9,"featured_media":745,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-744","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-perusahaan"],"fimg_url":"https:\/\/www.cirebonpower.co.id\/wp-content\/uploads\/berita_640111_800x600_IMG-20190222-WA0040.jpg","_links":{"self":[{"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/posts\/744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/comments?post=744"}],"version-history":[{"count":0,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/posts\/744\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/media\/745"}],"wp:attachment":[{"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/media?parent=744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/categories?post=744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cirebonpower.co.id\/id\/wp-json\/wp\/v2\/tags?post=744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}